| No | 
            DESCRIPTION | 
            UNIT | 
            Q'TY | 
          
          
            | A | 
            SCOPE OF WORK | 
             | 
             | 
          
          
            | Part 1 | 
            Servers and VMware License | 
             | 
             | 
          
          
            | I | 
            Servers: Details of one server with below features as minimum requirement: | 
            Set | 
            4 | 
          
          
             | 
            Chassis with up to 16x2.5" Drives | 
             | 
            1 | 
          
          
             | 
            Trusted Platform Module 2.0 V3 | 
             | 
            1 | 
          
          
             | 
            2.5" Chassis with up to 16 SAS/SATA Drives, 2 CPU | 
             | 
            1 | 
          
          
             | 
            Intel® Xeon® Silver 4310 2.1G, 12C/24T, 10.4GT/s, 18M Cache, Turbo, HT (120W) DDR4-2666 | 
             | 
            2 | 
          
          
             | 
            Heatsink for 2 CPU configuration (CPU less than 165W) | 
             | 
            1 | 
          
          
             | 
            32GB RDIMM, 3200MT/s, Dual Rank, 16Gb BASE x8 | 
             | 
            4 | 
          
          
             | 
            Raid Controller, (Raid 0,1,10,5,6) | 
             | 
            1 | 
          
          
             | 
            960GB SSD SATA Read Intensive 6Gbps 512 2.5in Hot-plug AG Drive, 1 DWPD | 
             | 
            2 | 
          
          
             | 
            Performance BIOS Setting | 
             | 
            1 | 
          
          
             | 
            UEFI BIOS Boot Mode with GPT Partition | 
             | 
            1 | 
          
          
             | 
            Standard Fan x6 | 
             | 
            1 | 
          
          
             | 
            Dual, Hot-Plug, Fully Redundant Power Supply (1+1), 1400W, Mixed Mode | 
             | 
            1 | 
          
          
             | 
            Power Cord - C13/C14, 4M, 250V, 10A (US, EU, TW, APCC countries except ANZ) | 
             | 
            2 | 
          
          
             | 
            Riser Config 1, 6x8, 2x16 slots | 
             | 
            1 | 
          
          
             | 
            Motherboard with Broadcom 5720 Dual Port 1Gb On-Board LOM | 
             | 
            1 | 
          
          
             | 
            Hardware management port | 
             | 
            1 | 
          
          
             | 
            Broadcom 57414 Dual Port 10/25GbE SFP28, OCP NIC 3.0 | 
             | 
            1 | 
          
          
             | 
            Dual Port 16Gb Fibre Channel HBA, PCIe Full Height | 
             | 
            2 | 
          
          
             | 
            SFP+ SR Optic, 10GbE | 
             | 
            2 | 
          
          
             | 
            Windows Server® 2019 Standard,24CORE,FI,Media Kit,no CAL, Multi Language | 
             | 
            1 | 
          
          
             | 
            Basic Next Business Day 36Months-ACDTS, 36 Month(s) | 
             | 
            1 | 
          
          
             | 
            ProSupport and Next Business Day Onsite Service-ACDTS, 60 Month(s) | 
             | 
            1 | 
          
          
             | 
            5 years warranty as per Manufacturer standards | 
             | 
            1 | 
          
          
             | 
            5 years next business day (8x5) technical support | 
             | 
            1 | 
          
          
            | II | 
            VMWare License | 
             | 
             | 
          
          
             | 
            VMWare VCenter Server 8 Standard 1 year + Support/Subscription for 1 Year | 
            lic | 
            1 | 
          
          
             | 
            VMWare Vsphere Server 8 Standard for 1 Processor + Support/Subscription for 1 Year | 
            lic | 
            1 | 
          
          
            | Part 2 | 
            HARDWARE INSTALLATION AND TECHNICAL SUPPORT | 
             | 
             | 
          
          
            | I | 
            Installation: | 
            lot | 
            1 | 
          
          
            | 1 | 
            installation servers on rack | 
             | 
             | 
          
          
            | 2 | 
            arrange the power cable for each | 
             | 
             | 
          
          
            | 3 | 
            connect the network cable for each server | 
             | 
             | 
          
          
            | 4 | 
            Re-check power and connection of Power Source to System | 
             | 
             | 
          
          
            | 5 | 
            Power on System | 
             | 
             | 
          
          
            | 6 | 
            System Health check (hardware)  | 
             | 
             | 
          
          
            | II | 
            Technical Set-up - Configuration  | 
            lot | 
            1 | 
          
          
            | 1 | 
            System firmware upgrade to Target version | 
             | 
             | 
          
          
            | 2 | 
            System Health check (all) | 
             | 
             | 
          
          
            | 3 | 
            IP Address Planning (if required) | 
             | 
             | 
          
          
            | 4 | 
            Do migrate VMs from old System to new System for Testing | 
             | 
             | 
          
          
            | 5 | 
            Support AD install and configure | 
             | 
             | 
          
          
            | 6 | 
            Testing (if needed) | 
             | 
             | 
          
          
            | Part 3 | 
            Other Requirements | 
            lot | 
            1 | 
          
          
            | 1 | 
            Bidder is requested to provide all equipment from the same manufacturer. | 
             | 
             | 
          
          
            | 2 | 
            Bidder is requested to supply sufficient quantity of each item. | 
             | 
             | 
          
          
            | 3 | 
            Bidder is requested to supply the trade mark, model, and part number of each item.  | 
             | 
             | 
          
          
            | 4 | 
            Warranty for all equipment: 5 years | 
             | 
             | 
          
          
            | 5 | 
            Support 24/7 online: 05 years after installation and set-up. | 
             | 
             | 
          
          
            | 6 | 
            Bidder is requested to supply the Manufacturer Authorization Letter to TLJOC to prove the warranty and technical support to TLJOC | 
             | 
             | 
          
          
            | 7 | 
            Certificate of origin (C/O): Authorized copy | 
             | 
             | 
          
          
            | 8 | 
            Certificate of Quality (C/Q) - Original: issued by Manufacturer | 
             | 
             | 
          
          
            | B | 
            GENERAL REQUIREMENTS  | 
             | 
             | 
          
          
            | I | 
            Goods Conditions | 
             | 
             | 
          
          
             | 
            The year of manufacturing: 2023 | 
             | 
             | 
          
          
            | II | 
            Delivery | 
             | 
             | 
          
          
            | 1 | 
            Time: 6-8 weeks from receipt of Letter of Award/ PO signing date | 
             | 
             | 
          
          
            | 2 | 
            Terms: Door to Door TLJOC's office in HCM City | 
             | 
             | 
          
          
            | III | 
            Warranty | 
             | 
             | 
          
          
            | 1 | 
            Warranty Certificate from Manufacturer: Original | 
             | 
             | 
          
          
            | 2 | 
            Warranty Certificate from Seller: Original | 
             | 
             | 
          
          
            | 3 | 
            Maintenance: 2 times per year | 
             | 
             | 
          
          
            | IV | 
            Other | 
             | 
             | 
          
          
            | 3 | 
            Supplier Experience: Provided the same Scope of Work for at least 5 projects | 
             | 
             |